The survey of a new dynamic project planning technique "PERT" (Program Evaluation and Review Technique) with sample analysis to a state economic development project
Dev, Som
Dev, Som
Citations
Altmetric:
Authors
Other Names
Location
Time Period
Advisors
Original Date
Digitization Date
Issue Date
1967-01-01
Type
Thesis
Genre
Keywords
Subjects (LCSH)
Electronic dissertations
Citation
Abstract
Table of Contents
Acknowledgement -- Schedule of symbols -- History of Pert -- Introduction -- Background information for sample project -- Advantages -- Pert network -- Developing the critical path -- Probability of metting the scheduled date -- Conclusion -- Normal distribution curve table A2 -- Calculation tables -- References list -- Bibliography -- Pert arrow diagram for the sample project
Description
Thesis (M.S.)-- Wichita State Universtiy, College of Engineering, Dept. of Mechanical Engineering