Convergence Sciences 2 -- Facility for Digital Transformation : FY2020 Capital Project Request
Authors
Advisors
Issue Date
Type
HLC evidence
Keywords
Citation
Abstract
Project scope: This facility is planned to be sited at the Southwest corner of Oliver St. and the 18th street entrance to the Wichita State University Innovation Campus. The design and construction of the facility will produce a permanent multi-story structure. The potential to building out the remaining portion of one of the multi- stories should be factored into the design. Overhead doors will be required at the “Client” areas as well as Product Development Area. A concrete surface drive will be needed to access the overhead doors in these areas. The future institute will house Testing Lab, Cyber Range, Deep Fake Lab, Product Development, Convergence Administration Area, T3 Software Development, SOC Area, Visual Simulation Studio and other.