| dc.contributor.advisor | Weheba, Gamal | en_US |
| dc.contributor.author | Jadhav, Sameer A. | |
| dc.date.accessioned | 2007-08-23T12:36:43Z | |
| dc.date.available | 2007-08-23T12:36:43Z | |
| dc.date.issued | 2005-12 | |
| dc.identifier.isbn | 9780542757747 | |
| dc.identifier.other | t05047 | |
| dc.identifier.other | AAT 1436562:UMI | |
| dc.identifier.uri | http://hdl.handle.net/10057/756 | |
| dc.description | Thesis (M.S.)--Wichita State University, College of Engineering, Dept. of Industrial and Manufacturing Engineering. | en |
| dc.description | "December 2005." | en |
| dc.description.abstract | A number of approaches have been proposed for applying statistical process control in short production runs. However little has been done to provide a methodology to compare and select from various statistical process control schemes or address setup approval, which is one of the most critical aspects of short production run. This research proposes a joint monitoring scheme that includes application of a combination of setup approval and self-starting scheme in short production run. The research also provides a methodology for selecting between setup approval and self-starting schemes based on robustness of these schemes to different levels of process shifts and capabilities. The scope of this research is limited to two setup approval schemes; Wheeler and Precontrol and two self starting schemes Q charts and Dynamic Exponentially weighted moving average charts. | en |
| dc.format.extent | 336993 bytes | |
| dc.format.mimetype | application/pdf | |
| dc.language.iso | en_US | en |
| dc.rights | Copyright Sameer A.Jadhav, 2005. All rights reserved. | en |
| dc.subject.lcsh | Electronic dissertations | en |
| dc.title | Setup approval and self starting schemes for short production runs | en |
| dc.type | Thesis | en |